Statewide California residential energy calculationsCall or text 415-722-7394

Remote service · All of California

Residential Title 24 energy calculations, prepared for permit review.

Energy modeling and CF1R documentation for homeowners, architects, designers, builders and contractors—without geographic limits inside California.

What this service is

The energy report behind the permit set.

A Title 24 energy analysis evaluates the proposed building design against California’s Building Energy Efficiency Standards. For residential projects, the resulting Certificate of Compliance is commonly called the CF1R.

The report is based on your plans and project specifications. Compliance can be demonstrated through the applicable prescriptive or performance pathway. When design choices do not comply, we identify practical options for the project team to consider.

Projects we commonly model

  • Accessory dwelling units (ADUs and JADUs)
  • Garage conversions
  • Residential additions
  • Interior remodels affecting energy features
  • New single-family homes
  • HVAC replacements and alterations
  • Window, insulation and envelope changes
  • All-electric and heat-pump projects

What to send

A clean intake makes a faster report.

If every item is not available yet, send what you have. We will identify what is missing before modeling begins.

1

Plans

Floor plans, elevations, sections, window and door schedules, construction assemblies and project square footage.

2

Equipment & systems

HVAC type and efficiency, water-heating equipment, ventilation, solar or battery information when applicable.

3

Project details

Full address, climate location, permit scope, responsible designer and preferred delivery timeline.

Statewide coverage

From Eureka to San Diego—your plans come to us.

Title 24 calculations are completed remotely, so we serve residential projects in every California county. Local climate zone, project type, permit date and design specifications are incorporated into the applicable analysis.

Bay AreaSacramentoLos AngelesSan DiegoCentral ValleyCentral CoastNorth CoastInland Empire

Our process

Designed for fewer revisions.

Plan review

We check the submitted plans and specifications for the information required to model the project.

Energy modeling

We model the building and compare the proposed design with the applicable energy-code baseline.

Coordination

If changes are needed, we provide clear compliance options for the owner and design team.

CF1R delivery

We prepare the applicable compliance documentation for inclusion in the permit submittal.

Important: A Title 24 calculation is different from field verification. Some projects also require independent HERS/ECC testing after installation. Your CF1R identifies the measures that apply.

What happens after the CF1R?

During construction, the responsible installers complete applicable CF2R installation documents. A certified ECC rater completes applicable CF3R verification documents after performing required field inspections or diagnostic tests.

Learn about field testing

Start with your plans

Request a statewide Title 24 quote.

Tell us the address, project type, square footage and plan status.

Call or text 415-722-7394
Message Us on WhatsApp