Duct leakage testing
Calibrated pressure testing of applicable new, altered or existing duct systems, including approved accessible-leakage procedures when applicable.
Northern California on-site service
We perform the field verification and diagnostic tests identified on the approved compliance documents, explain the results and complete the applicable rater documentation through the registry workflow.
Complete testing menu
Not every project requires every test. The registered compliance documents, permit date, equipment and construction stage determine the required scope.
Calibrated pressure testing of applicable new, altered or existing duct systems, including approved accessible-leakage procedures when applicable.
Measurement of delivered airflow through applicable space-conditioning systems using an approved diagnostic method.
Measurement of fan electrical power in relation to delivered airflow for systems that require verification.
Verification of eligible cooling and heat-pump equipment under the required operating and environmental conditions.
Confirmation that installed indoor and outdoor equipment matches the approved compliance documentation.
Verification of ventilation equipment, controls and delivered airflow when required by the project documents.
Kitchen exhaust airflow testing plus applicable sound-rating, label and installation verification.
Local bathroom exhaust airflow and applicable control verification when listed for the project.
Diagnostic testing of building or dwelling-unit enclosure air leakage when required by the compliance approach.
Stage-sensitive QII inspection of framing, air sealing and insulation quality before required work is concealed.
Applicable equipment, controls, airflow, refrigerant-charge and installation measures for ducted or ductless heat-pump systems.
Completion of applicable rater verification documents after successful testing and when project information and required signatures are ready.
Verification of applicable duct-location requirements, conditioned-space placement and compliance credits identified by the project documents.
Review and verification of applicable return-air duct design and air-filter device sizing requirements.
Verification of eligible buried-duct conditions, insulation levels and applicable duct surface-area reduction credits.
Airflow and fan-efficacy diagnostic testing for eligible whole-house ventilation cooling systems when required.
Equipment, controls and compliance-credit verification for eligible variable-capacity heat-pump systems.
Verification of applicable existing features used to support alteration compliance when identified by the approved documents.
Verification of eligible single-dwelling-unit domestic hot-water distribution measures when included in the project scope.
Stage-sensitive inspection coordination for QII, air sealing, ducts and envelope measures before the work is concealed.
Focused retesting after the responsible installer completes corrections to a failed measured item.
Review of available legacy records to identify the current registry path, missing participants and required next steps.
Review of available permit and compliance records to identify incomplete verification and registry items within our professional scope.
Project guides
Use our plain-language resources to identify documents, prepare the installation and avoid preventable return trips.
What is checked, what must be accessible and which product information helps.
Read the kitchen guide →Why framing, air sealing and insulation must remain visible for the required stages.
Read the QII guide →Who prepares and signs each document and how they relate to testing and closeout.
Read the document guide →Before the appointment
The appointment
We confirm the system, applicable measures and required verification scope.
We inspect the relevant equipment, installation and accessible features.
We perform the required measurements using the applicable procedure.
We explain pass/fail items and complete applicable rater documentation when all information and signatures are ready.
Need to schedule?
Include the full address, project scope, system count and preferred appointment window.