Document responsibilities

CF1R, CF2R and CF3R: three different parts of the compliance record.

The documents work together, but they are not completed by the same person or at the same project stage.

1R

CF1R — Certificate of Compliance

Describes the approved energy design, project features and applicable field-verification measures. It is generally prepared during design or permit review by the responsible documentation author.

2R

CF2R — Certificate of Installation

Records applicable installed features and is completed by the responsible installer or contractor for that scope. A rater does not replace the installer’s responsibility.

3R

CF3R — Certificate of Verification

Records applicable independent field verification performed by the ECC rater after the required inspection or diagnostic test.

Before testing

Make sure the project record is usable.

  • Correct project address and permit information
  • Registered CF1R available
  • Installed equipment matches the approved design
  • Responsible installer identified
  • Required CF2R documents available or progressing
  • Owner, builder and contractor accounts ready when applicable

Who closes the permit?

The rater completes applicable verification within the rater’s scope. Installers complete their installation documents. The documentation author manages the approved compliance design. The building department controls inspections, final approval and permit closure.

Missing a document?

Send the registered project information.

We can help identify the missing step and the responsible project participant.