California HERS/ECC & Title 24 resources Call or text 415-722-7394

Resource center

California energy-compliance requirements, explained clearly.

Practical guides for homeowners, contractors, builders and permit teams—from the first CF1R through installation documents, field verification and final project coordination.

Start here

Choose the question you need answered.

Requirements depend on the approved compliance documents and project conditions. These guides help you prepare; the registered project record remains authoritative.

What happens at a HERS/ECC test?

Review the required documents, site preparation, access and typical appointment sequence.

Testing checklist →

What are CF1R, CF2R and CF3R?

Understand the compliance, installation and rater-verification documents and who completes each one.

Document guide →

Kitchen range hood verification

Learn about airflow, sound-rating information, installation and access needed for verification.

Kitchen guide →

Quality Insulation Installation

Learn why QII is stage-sensitive and what must remain visible before drywall or concealment.

QII guide →

Complete testing menu

Duct leakage, airflow, fan efficacy, refrigerant charge, ventilation, blower door and equipment verification.

All testing services →

Title 24 calculations

Learn when residential energy modeling and a CF1R may be needed for permits and design.

Statewide reports →

HERS, ECC & Title 24 glossary

Definitions for CHEERS, CF1R, CF2R, CF3R, QII, IAQ, PSR, blower door, duct leakage and permit closeout.

Search the glossary →

Official California resources

Use current primary sources.

Project requirements change by code cycle and scope. These links lead to authoritative California Energy Commission and Energy Code Ace resources.

2025 Building Energy Efficiency Standards

Current 2025 code-cycle materials, compliance information and supporting resources.

View 2025 CEC resources →

The basic document path

Compliance → installation → verification.

  • CF1R identifies the approved energy features and required verification measures
  • CF2R records applicable installation information by the responsible installer
  • CF3R records applicable independent field verification by the rater
  • The building department controls final inspection and permit closure

Avoid preventable delays

Send the documents before scheduling.

Provide the complete address, permit number, registered CF1R, system count, contractor contact and requested timing. For QII, request inspection before the work is concealed.

Request project review

Still unsure?

Send the permit and CF1R.

We can identify the listed verification measures and help you understand the next step.

Call or text 415-722-7394
Message Us on WhatsApp