Before the appointment

Prepare the project for HERS/ECC testing.

A test-ready site protects the schedule and reduces avoidable return visits. Use the approved compliance documents—not a generic checklist—to confirm the actual project scope.

Documents

  • Full address and unit
  • Permit number and application date
  • Registered CF1R
  • System count and equipment models
  • Installer and billing contacts

HVAC systems

  • Mechanical and electrical work complete
  • Equipment powered and operational
  • Filters installed
  • Registers and returns accessible
  • Thermostats and disconnects accessible

Ventilation & exhaust

  • Range hood installed and operational
  • Product model information available
  • Bathroom fans complete
  • Whole-building ventilation operational
  • Exterior terminations accessible

Envelope & QII

  • Required work remains visible
  • Attic and crawlspace safely accessible
  • Air sealing complete for the stage
  • Insulation installed to the required stage
  • No drywall or concealment before approval

People & access

  • Adult site contact available
  • Gates and units accessible
  • Pets secured
  • Ladders or special access coordinated
  • Installer reachable for technical questions

If a test does not pass

We explain the observed issue within our scope. Corrections are completed by the responsible contractor or project team. Retesting may be required before verification documents can be finalized.

Ready to schedule?

Send the CF1R and complete address.

Include the requested date, system count and construction stage.