HERS test

The familiar industry term for independent field verification and diagnostic testing of applicable residential energy measures. Current 2025 Energy Code materials use the ECC program name.

ECC

Energy Code Compliance field verification under California’s current program terminology. Project documents identify the measures requiring an independent certified rater.

Title 24, Part 6

California’s Building Energy Efficiency Standards. Requirements depend on the code cycle, permit date, occupancy, project scope, compliance approach and approved documents.

CF1R

Certificate of Compliance. It describes the approved energy design and applicable verification measures for a residential project.

CF2R

Certificate of Installation. The responsible installer records applicable installed features and takes responsibility for that installation scope.

CF3R

Certificate of Verification. The certified rater records applicable independent inspection or diagnostic results after completing the required verification.

CHEERS

A California Energy Commission-approved ECC Provider that supports certified raters and operates an approved residential data registry.

Duct leakage test

A calibrated pressure test used to measure air leakage from an applicable duct system. The approved documents and actual system conditions determine the procedure.

System airflow

Diagnostic measurement of delivered airflow through applicable space-conditioning equipment using an approved method.

Fan efficacy

Measurement of electrical fan power in relation to delivered airflow for systems requiring verification.

Refrigerant charge

Verification of eligible cooling or heat-pump equipment under the applicable operating and environmental conditions.

Rated equipment

Confirmation that installed indoor and outdoor equipment corresponds with the approved compliance documentation.

IAQ & ventilation

Indoor air-quality and mechanical ventilation measures, which may include equipment, controls and delivered-airflow verification.

Kitchen range hood verification

Local mechanical exhaust airflow testing plus applicable sound-rating, label, installation and accessibility checks.

Blower door test

Diagnostic testing that measures air leakage through a building or dwelling-unit enclosure when required by the project’s compliance approach.

QII

Quality Insulation Installation verification. Stage-sensitive air-sealing and insulation inspections generally must occur before the required work is concealed.

PSR

Project Status Report. Some jurisdictions request a PSR to summarize the project’s documentation or verification status; the city controls whether it accepts the document.

POR

Proof or report of results terminology may vary by workflow. Always confirm the exact document requested by the enforcement agency or registry.

Permit closeout

The process of completing outstanding inspections and documentation. Passing ECC verification supports compliance but does not itself close a permit.

CalCERTS transfer

Review of available legacy project records to determine the current CHEERS path, participants, documents and verification steps.

Pre-cover inspection

A stage-sensitive inspection completed before applicable air sealing, insulation, ducts or envelope details become inaccessible.

Project-specific answers

The glossary explains terms. Your documents control the scope.

Send the complete address, permit number, CF1R, system count, contractor details and construction stage for a project review.

Explore next

Use the detailed guides.

Need help identifying the next step?

Send the permit and compliance documents.

Appointment requests remain pending until our office reviews and confirms the project.

Call or text 415-722-7394
Message Us on WhatsApp